Free Weekly Pool Svc Work Order
Please make sure to follow the instructions on water testing for the most accurate results.
First Name
Last Name
Email
Phone Number
Weekly Test Results and Treatments
Chlorine PPM
Manual shock type and amount
Chlorine Tablets in Feeder
Select an option
0
0.5
1
2
3
4
5
Chlorine Treatment
Manually shocked pool
Decreased Salt system %
Increased Salt system %
Left Salt system % alone
Disabled Salt system
High chlorine added none
Salt System % output
Select an option
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
24 hr Boost
Inspect/Clean salt cell by-monthly
PH
PH adjusted with?
Normal Services to the Pool and Equipment.
Cleaned Tile
Cleaned debris from pool surface and floor
Brushed Pool/Spa rough areas weekly
Brush entire pool every 2/3 weeks
Cleaned Baskets
Inspected equipment
No Errors found
PSI on high speed
Picture of Pool
Select a File
Picture of PSI
Select a File
Bulk Chemicals
Test at the beginning of each Month.
Alkalinity PPM
Alkalinity lbs. added
Calcium Hardness PPM
Calcium Hardness lbs. added
Stabilizer PPM
Stabilizer lbs. added
Salt PPM
Salt bags added
Algaecide if used
Clarifier if used
Filter media if used
Metal Out if used
Submit
Powered by