Job Name
Supervisor Name
PCWT With Sales, Supervisor, and Customer
Initial the Following Once Completed
Paint USA marks near gas and electrical meter and post picture to GroupMe.
Bring 1 Plan, addendum(s) and Excavation Checklist.
If there is a demo, paint all items to be removed.
Recommend customer remove anything from yard they want to save.
Don't forget the concrete near the gas meter.
Have customers move anything in access such as plants, drip lines, A/C, etc.
If plywood boards are needed, they should be brought out at time of demo - figure out # of boards.
Actions During PCWT
Initial the Following When Completed
Stuff access drains and add measurements to plan.
Lay out pool, retaining wall, equipment pad, gas lines, electrical outlets, hose bibs, skimmer, cover switch, sump box, solar pre-plumb, anti-siphon valves. Discuss with customer and note any changes on plan. Write addendum for additional utilities.
Paint concrete, structures, plants, trees, and any other objects to be removed prior to excavation - including concrete near gas meter for utilities.
Have customer sign off plan and Excavation Checklist. Give customer the Construction Supervisor's contact info.
Shut off all irrigation and collect payment for any addenda.
Add-On Costs
If there are any add-ons, calculate their cost and write the number of items and the cost into the corresponding box below. If there are changes, turn in an updated plan to the scheduler. If there are none, you may click submit.
Electrical Outlets: $8/ft + $50 for outlet/cover
3/4' Gas Line: $10/ft + $250 for gas riser
3/4' Hose Bib: $7/ft
Solar pre-plumb: $20/ft
Additional Benches to Pool: $100/ft